Tuesday, 10 September 2013

Day Two - Pegs

Nothing much visible on the land than having our lot number and some pegs around the boundary. We are assuming the pegs just show the boundaries of the proposed construction










Monday, 9 September 2013

Day One - Slab cut


The day that PD provided us for site start was 9th of September. When we went past on Saturday we saw this and knew its gonna start soon.

Calm before the storm :)

A friend of ours send this picture to us while we were at work and so finally its begun on the day they promised. 



At the end of day 1, follow the link to view the land.
http://360.io/m7EJb9

Here are some pictures of the land too.





We are glad its begun and praise God for his blessings.

Friday, 26 July 2013

Contract Appointment

Our Contract appointment was held on 26th of July.

A lot of preparation went into it as we were still going back and forth with choosing things. We made it early for the appointment and waited to be called.

Our consultant Simon was pretty good. He was patient enough to listen and to respond. Since we wanted an August site start we had to get things going.

We had to go through many documents and read through the contract to get it signed. It was a bit more thorough than expected because it went for over 5 hours! There were some changes incorporated for which we will be getting post contract variation document which is not part of the main contract.

So we signed the contract and it seems it's all systems go and we are glad its done.

Saturday, 20 July 2013

National Tiles Appointment

We started early morning to Hopetun to finalise our colour selections and lo and behold we changed our exterior colours. 

After that we went to National tiles for our tile appointment. This was the part that we loved the most. because it was the easiest of it all. Since we are going timber and carpet for our flooring it was just the laundry and bathrooms that we needed to select the tiles for.

We are pretty much excited to see how our selections going to turn into reality in our new home.

Thursday, 18 July 2013

Hopetun and Electrical Appointment

We had both our Hopetun and Electrical Appointment on the same day. After reading from forums we knew its going to be a long day.

The colour selection was in a rush. We only had the general plan to start with. 

After finishing Colours, we had a good one hour break. Electrical appointment was done by Karen. We were prepared well in advance with where we wanted the switches and lights. So it went well and we did not have much of a difficulty choosing them. 

The only thing that had us upset was that PD wasn't installing the sensor needed for the flood lights outside the home and that to keep the energy rating to be 6 star we have to pay for the sensor.


Thursday, 11 July 2013

Tender Signing


After a whole lot of going back and forth we signed our tender on the 11th of July 2013.

Now just have to wait for the appointments for colour and electrical.


Wednesday, 22 May 2013

Soil Survey Test

The initial customisation was done and $1000 deposit given on the 30th of April.

Visited the site many times during the month to see if there were holes in the ground but found none at all.

When we visited the site on the 22nd of May , twas finally done.

And now we cant wait to get the Soil Survery results